Product Pulse — Team-2 ADS Q2 W22 - 01-05 Iunie

Planned sprint ADS Q2 W22 - 01-05 Iunie • planning snapshot + end-of-sprint outcome snapshot

This retrospective uses the planning snapshot as the baseline promise set for sprint intent and entry kind, and the outcome snapshot as the actual end-of-sprint result.

Download DOCX

Executive summary

Yellow. The sprint closed 4 of 16 visible items, including 1 Stories, 1 Tasks, and 2 Bugs. Product movement was real, but the sprint was still noisy: 7 items entered after planning and 3 of them were closed. The main misses were concentrated in 12 carryovers.

Top-line metrics

MetricValueHow to read it
Visible sprint items16Normalized sprint fact base: planning baseline plus outcome additions and planning-only misses
Delivered items4Items whose final outcome bucket is Done
Carry overs12Items not closed at sprint review
Delivered mix1 / 1 / 2Stories / Tasks / Bugs delivered
Entry kind mix9 / 7 / 0Planned / Added during sprint / Stretch visible
Readiness mix7 / 9 / 0Ready / At risk / Not Ready across the normalized sprint fact base
Progress items behaving as intended1/2Progress items were expected not to finish in this sprint

Capacity context

SignalValueHow to read it
Available capacity50Policy-weighted engineering availability after holidays and OOO
Nominal capacity54.4Active workdays after weekends and bank holidays, before OOO
OOO capacity4.4Vacation / OOO days from tracker evidence when present
Bank holiday capacity13.6Policy-weighted public-holiday capacity removed from the sprint window
Included people18People with non-zero implementation capacity in this sprint window

Capacity is companion context for the pulse; it does not alter snapshot issue-count denominators.

It is not a true hours estimate.

OOO tracker export: capacity_ooo_tracker_export.csv

Pavel Petronel replaced Dron Gabriel

Paul Tanasuca ended without configured replacement

Rojan Shrestha replaced Raul Popovici

Stories done (1)

Below are the items marked Done in the sprint review snapshot, grouped by work-item type.

Jira itemHow entered
ADS-6611 — [Admitere v2] - Notificari la modulul admiterePlanned

Tasks done (1)

Jira itemHow entered
ADS-7320 — [Stiri] - AntivirusAdded

Bugs done (2)

Jira itemHow entered
ADS-7643 — [FE/BE] - Bugs Admitere v2Added
ADS-7749 — [FE] - Director/Secretar deconectat din cont cand acceseaza platformaAdded

Carry overs / not delivered (12)

Jira itemWhy it carried
ADS-1757 — Story — [Financiar] - Plati partialeDependency delay
ADS-6494 — Story — Log levels & Log formatsNot started
ADS-7284 — Story — Refactorizare "Anuleaza recurenta"Partial completion
ADS-7405 — Story — [BE] - Local CacheDependency delay
ADS-7423 — Task — [Stiri] - Updates after release/feedbackPartial completion
ADS-7427 — Story — [Admitere v2][Taxe] - 3. Admin Vizualizare/Validare platăDependency delay
ADS-7428 — Story — [Admitere v2][Taxe] - 4. Candidate - Necesita modificăriPartial completion
ADS-7430 — Story — [Admitere v2][Taxe] - 5. Export platile candidatuluiNot started
ADS-7487 — Story — [Admitere v2] - Adaugare candidat in billing&eliberare chitantaPartial completion
ADS-7519 — Task — [BE] "Afișează noutăți Adservio" toggle is non-functionalDependency delay
ADS-7743 — Bug — [FE/BE] - Bugs Admitere v3Partial completion
ADS-7773 — Bug — [BE][UPA-Admitere] - BugsPartial completion

Blocker / miss pattern

MetricValueHow to read it
Partial completion4Carryovers blocked by partial completion
Dependency / competing work4Delivery slipped because attention or dependency landed elsewhere
Not started2Committed item never really got underway

Data-quality caveats

This product pulse is retrospective only and uses the planning snapshot for baseline fields and the outcome snapshot for actuals.

1 rows have Sprint Intent = Progress and remained open; they are treated as healthy continuation rather than finish misses.

Traceability / drill-down

Report elementHow to drill downTraceability mechanism
Delivered Stories / Tasks / BugsClick the section count rowsSnapshot-exact JQL by issuekey list
Carry overs / not deliveredClick the Carry overs countSnapshot-exact JQL by issuekey list
Miss pattern summaryClick each miss-pattern countSnapshot-exact JQL by issuekey list

Snapshot and fact-base list links

SnapshotIssue countLink
Planning snapshot raw list1515 issues in the planning snapshot
Sprint review / outcome snapshot raw list1717 issues in the Friday review snapshot
Normalized sprint fact base1616 issues used for metrics and drill-down

Planning and outcome are separate frozen moments.

Metric tables use the normalized sprint fact base, which keeps planning-only misses and outcome-only additions visible for traceability.

Evidence artifacts

ArtifactLink
Issue audit registerOpen issue-level audit CSV
Metric lineageOpen metric lineage CSV
JQL traceability registerOpen JQL traceability CSV
Sprint metrics JSONOpen sprint metrics JSON

Use these files when you need to validate the exact rows and formulas behind a pulse claim.