Sprint Pulse

Product Pulse — Team 1 ADS Q3 W28 - 13-17 Jul

Planned sprint ADS Q3 W28 - 13-17 Jul • planning snapshot + end-of-sprint outcome snapshot

This retrospective uses the planning snapshot as the baseline promise set for sprint intent and entry kind, and the outcome snapshot as the actual end-of-sprint result.

Download DOCX

Executive summary

Yellow. The sprint closed 8 of 16 visible items, including 2 Stories, 1 Tasks, and 4 Bugs. Product movement was real, but the sprint was still noisy: 15 items entered after planning and 8 of them were closed. The main misses were concentrated in 8 carryovers.

Top-line metrics

MetricValueHow to read it
Visible sprint items16Normalized sprint fact base: planning baseline plus outcome additions and planning-only misses
Delivered items8Items whose final outcome bucket is Done
Carry overs8Items not closed at sprint review
Delivered mix2 / 1 / 4Stories / Tasks / Bugs delivered
Entry kind mix1 / 15 / 0Planned / Added during sprint / Stretch visible
Readiness mix7 / 9 / 0Ready / At risk / Not Ready across the normalized sprint fact base
Progress items behaving as intended3/4Progress items were expected not to finish in this sprint

Stories done (2)

Below are the items marked Done in the sprint review snapshot, grouped by work-item type.

Jira itemHow entered
ADS-5784 — [FE/BE] Refactor pagina de permisiuniAdded
ADS-6545 — [SDK] Implementare v1 layer comunicare native-web *post message bridgeAdded

Tasks done (1)

Jira itemHow entered
ADS-8205 — [FE]: Modificari rute pentru MobileAdded

Bugs done (4)

Jira itemHow entered
ADS-8224 — [FE] La editarea elevului, campul "rol" nu afiseaza optiuni in dropdown si impiedica salvarea modificarilorAdded
ADS-8245 — [FE] Preferințe generale alignmentAdded
ADS-8257 — [BE] - Eroare 400 la debifare afisare in catalog a unui transfer intre claseAdded
ADS-8269 — [Documente - Catalog] - De modificat fontul primei paginiAdded

Carry overs / not delivered (8)

Jira itemWhy it carried
ADS-2590 — Bug — [Students] - Trebuie inlocuit articolul de la model import automat-date de completare si sa se deschida articolul din manualul de utilizare daca de da click pe linkul respectivPartial completion
ADS-3896 — Bug — [Classes][Homework] -Problema la Trimiterea Temelor Corectate din aplicatia de mobilNot started
ADS-7816 — Story — [SIIIR] - Import clasePartial completion
ADS-7907 — Task — [BE] Refactoring SQL_CALC_FOUND_ROWSPartial completion
ADS-8067 — Improvement — [Incadrare] Refactoring React & APILate start / sequencing
ADS-8105 — Story — Impartirea pe modulePartial completion
ADS-8209 — Bug — [Prod][AWS][legacy-web] GET /api/v2/fisiere/view returns HTTP 500 when M_fisiere.php calls query() on nullNot started
ADS-8262 — Story — [FE] Responsive conduită / listă eleviPartial completion

Blocker / miss pattern

MetricValueHow to read it
Partial completion4Carryovers blocked by partial completion
Dependency / competing work0Delivery slipped because attention or dependency landed elsewhere
Not started2Committed item never really got underway

Data-quality caveats

This product pulse is retrospective only and uses the planning snapshot for baseline fields and the outcome snapshot for actuals.

3 rows have Sprint Intent = Progress and remained open; they are treated as healthy continuation rather than finish misses.

Traceability / drill-down

Report elementHow to drill downTraceability mechanism
Delivered Stories / Tasks / BugsClick the section count rowsSnapshot-exact JQL by issuekey list
Carry overs / not deliveredClick the Carry overs countSnapshot-exact JQL by issuekey list
Miss pattern summaryClick each miss-pattern countSnapshot-exact JQL by issuekey list

Snapshot and fact-base list links

SnapshotIssue countLink
Planning snapshot raw list1212 issues in the planning snapshot
Sprint review / outcome snapshot raw list2121 issues in the Friday review snapshot
Normalized sprint fact base1616 issues used for metrics and drill-down

Planning and outcome are separate frozen moments.

Metric tables use the normalized sprint fact base, which keeps planning-only misses and outcome-only additions visible for traceability.

Evidence artifacts

ArtifactLink
Issue audit registerOpen issue-level audit CSV
Metric lineageOpen metric lineage CSV
JQL traceability registerOpen JQL traceability CSV
Sprint metrics JSONOpen sprint metrics JSON

Use these files when you need to validate the exact rows and formulas behind a pulse claim.